Recovery Exercise | 2003 - Boston, MA Photos

2003 Q3—Boston, Massachusetts Photos

Attaching ground wire to a ground rod.
An NDR Operations Team member attaching grounding wire to a
ground rod. All of the equipment at a recovery site is attached
to a common ground ring. This protects the team and the equipment.
September 15, 2003.

Power cabling in Boston, MA.
Operations Team members running power cables from a 500 kW
power trailer. Each of the technology trailers has its own on-board
generator, rectifiers and batteries to provide back-up power when
other sources are not available. September 15, 2003.

Technology turn-up in Boston.
NDR team members testing connectivity in one of the recovery
trailers at the Boston exercise. September 16, 2003.


Boston site overview.
Overview of the Boston exercise site on Wednesday morning,
September 17, 2003.

Site tour at the Boston exercise site.
NDR hosted customer tours at the Boston site on September 17.

Winding up cable.
The team broke down the site and prepared
the trailers for travel on Wednesday afternoon,
September 17. The photo shows T3 communication
cables being taken up with a power winder.